4/28/2024 0 Comments Handicap pool step rail![]() The Saftron rails come with color-coordinated escutcheons. Way easier than trying to accurately set both anchors and hope the rail fits both. The rail will still move (wiggle) a bit unless you get commercial rails that are a different configuration and more expensive.Īfter the setting compound has cured, attach the loose anchor to the inner leg, set the outer leg in the anchor in the deck with the inner going into the hole and pour the setting compound around it while it is attached to the rail. Anchor fits flush with the surface of the deck and rails can be removed by loosening the bolt. The bronze anchors hold Saftron rails more securely than the vinyl ones that Saftron makes. While it is setting drill the inner hole. Takes about 20 minutes to set so it can be worked with. The 4" circle will be covered by the escutcheon.Īfter the hole is prepared, use a short piece of 1.5" pipe in the outer anchor to set it plumb with a level. As they are inexpensive, get 2 or 3 at least 6" or longer. Its actually fairly easy to drill with a bit that small, just tedious. Before I bought one, I used a 1/4" masonry bit, drilled a series of holes in a 4" circle, drilled more through the area in the center and just broke out the concrete. For Sartron that is a RTD-340.Ī 4" bit and large roto-hammer can be rented for about $100. ![]() Usually that requires one that is 40" long. Be aware that such anchors do require an inexpensive setting tool for installation.Ĭlick to expand.A handrail should extend out to the second step of a pool. The viable solution is to use bolts and drop-in anchors. These also would be unsatisfactory since the stud is not removable and therefore does not make for a flush surface. There are several types of anchors available for concrete that permanently install a stud with a nut attachment. The hardware is not an adequate solution when removing and reinstalling the base mounts multiple times. This might be fine for a one-time permanent install. Saftron's mounting bases are supplied with 5/16 stainless steel lag bolts (2 5/8 inches long), washers, and plastic anchors that can be used in concrete. The Saftron website provides detailed dimensional information on the various pool handrails, but hadn't provided specific hardware information relative to the mounting bases. However the bases would need to be removed every Fall and then reinstalled in the Spring for winter cover use. Conversely, the mounting bases are a do-it-yourself install. ![]() The advantage, though, is that there would now be a mounting surface that is flush with the deck to facilitate winter cover use. The former method requires special core drilling equipment. The other choice is to surface mount using Saftron's mounting bases. The first is to drill the concrete deck to the diameter of the rail and then install clamping fixtures to make a socket mount. A copy/paste of the relevant part, but I've no idea if this is a good or workable solution! Jim or someone else knowledgeable about this sort of stuff probably knows! If you follow Jim's Amazon link in post 11 and then read the first review by "CJS", they used the Saftron ladder with the mounting bases but a stronger anchor solution so they can (as it reads to me) be repeatedly removed for the winter cover.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |